Asphalt was poured to bridge the divide between the garage apron and the alley.
Denver and I rented a two man auger and dug holes for sono tubes. now we can place the pillars that will support the roof over the entrance way as well as the deck. I filed the two sono tubes for the deck on the last semi-nice day before the snow fell and the really freezing temperatures arrived. Hallelujah.
And finally Matt started installing the dry wall. Hopefully that will finish up later this week snd then I can get the painters in.
I got word this week that the cabinets will be delivered on December 12th and installation will begin the following day. Hopefully that means flooring can begin on the 17th or so.
Unloading fill
More of the same
Filling in the gas line trenches
Fill and parking pad completed.
Waiting for asphalt
Asphalt completed. As you can see, we still need garage doors. Those should arrive later this week
Dry wall delivered and waiting for installation
Matt installing drywall in the walk-in closet