Finally, the underground gas lines were installed today. I've had this trench dug for over two months. Next week, I have a Bobcat coming in the bring in fill and cover up these trenches. My kitchen designer was in today as well to take measurements. Bad news is, it's another 6 weeks till the cabinets will be ready. That means I'll be here till the second week of December if everything else goes well.
The final gas lines
The garbage bin was finally filled so I had it hauled away today. I then cleaned out the area in preparation for some infill next week.