Finally we have a floor poured. Everything has been held waiting on this step. Now the stairs can be hung, and the trades can come in and run their pipes and ducting and wires.
The framers should be in tomorrow to hang the stairs and build the walls in the garage that will frame in the utility room and the entryway.
No comments:
Post a Comment